What's New
The most recent changes will be highlighted with a "New" or "Updated" icon to help you quickly identify the modifications. (For a history of modifications, see the Change Record Table at the bottom of the document.)
· August 2021: Oracle Database 21c (21.3) released on Linux.
· June 2021: Oracle will use best effort to support the Oracle 12.1.0.2 Database on Microsoft Windows until July 2022. See Table 1
· May 2021: Oracle Instant Client 19.10 released on Linux on ARM
May 2021: Oracle is not planning to release 21c on IBM AIX Power Systems and IBM Linux on System Z
Oracle is mindful of the unprecedented economic and business disruption our customers faced in 2020. We decided to not promote our Database 20c Preview version to General Availability. Instead, we incorporated all of the 20c functionality into the 21c release and made 21c available initially in our Autonomous Database Free Tier so that all can test drive the new features and enhancements for free.
Oracle recommends the following upgrade options:
- For
product longevity and patching, Oracle strongly recommends upgrading to
19c which is the Long Term Release with a support end date of April 30,
2027 (or April 30, 2024 if you choose not to pay Extended Support fees or
purchase a ULA).
- If
you are currently running 11.2.x/12.1.x you will need to upgrade to the
terminal release (i.e. 11.2.0.4/12.1.0.2) for the DB Release you are
running and then continue the upgrade process by upgrading to the 19c.
- If
you are currently running 12.2.0.1 or 18c, you should upgrade to 19c
without delay. 18c is in Sustaining Support.
For questions related to certification
combinations and Lifetime Support agreements with other Oracle products like
Oracle E-Business Suite, Oracle JD Edwards, Oracle PeopleSoft, and Oracle
Siebel, please contact your Oracle Account Representative.
Patching End Dates for Roadmap
Release |
Notes and Exceptions |
|
21cInnovation Release |
April 30, 2024 |
|
19c Long Term Release |
April 30, 2024 with no ES/ULA April 30, 2027 with ES/ULA |
|
18c Innovation Release |
Jun 30, 2021 |
|
12.2.0.1 |
March 31, 2022 (Limited Error Correction from Dec 1, 2020 through
March 31, 2022) |
|
12.1.0.2 Terminal Release |
Jul 31, 2022 with paid ES, ULA, or EBS waiver |
* One additional year (01-Aug-2021 through 31-July-2022) has been
added to the 12.1.0.2 DB Extended Support time frame with the following
exceptions:
|
12.1.0.1 |
Aug 31, 2016 |
|
11.2.0.4 Terminal Release for 11.2 |
|
|
Change History (2020 -2021)
Date |
What
Changed? |
13-Aug-2021 |
Oracle
Database 21.3 released on Linux with a patching end date of April 30, 2024 |
08-Jun-2021 |
Oracle
will use best effort to support the Oracle 12.1.0.2 Database on Microsoft
Windows until July 2022. See Table 1 above. |
03-Jun-2021 |
Added Market
Driven Support is not available for PSM-based OCI DBCS, in 11.2.0.4 |
05-May-2021 |
Oracle
Instant Client 19.10 released on Linux on ARM |
04-May-2021 |
Oracle
is not planning to release 21c on IBM AIX Power Systems and IBM Linux on
System Z (Added link to Doc ID 2766930.1 05/06/2021) |
16-Dec-2020 |
Updated
Table 1 11.2.0.4 Market Driven Support bullet for Database Cloud Services |
08-Dec-2020 |
Updated
Roadmap, Added 21c information |
23-Nov-2020 |
Changed
end date for 18c from June 08, 2021 to June 30, 2021 to match contract date
requirements. |
12-Oct-2020 |
Added
OpenVMS Itanium Support dates that will extend their support until Dec 31,
2021. See Table 1 - 11.2.0.4 section above. |
02-Sep-2020 |
Added
additional information around 11.2.0.4 DBCS and Market Driven Support. See
Table 1- 11.2.0.4 section above. |
03-Aug-2020 |
Because
12.2.0.1 LEC applies to all on-prem and DB cloud services, removed the
following from 12.2.0.1 bullet points: 'Limited Error Correction applies to
Gen 1 ExaCC, OCC DBCS, and ODA (UPDATED)'. Added
a comment that MDS does not apply to DBCS (This comment was removed
02-Sep-2020) Amended
12.1.0.2 EXS extension to specifically call out the Windows exception end
date is the 'Patching/Error Correction end date'. In certify,
the EXS date for Windows platforms will still show as July 31, 2022 due to a
tool limitation but patching (including bundles) will stop July 31, 2021. |
10-Jun-2020 |
Added Long Term and Innovation release definitions, added updated
Premier and Extended Support dates for 19c, added terminal release for the
Solaris x86-64 bit platform, clarified the 12.2.0.1 additional 3 months of
support for Gen 1 ExaCC, OCC DBCS, and ODA has been absorbed into Limited
Error Correction window. |
15-Apr-2020 |
Added Limited Error Correction for 12.2.0.1 from Dec 1, 2020-
until March 31, 2022 |
23-Mar-2020 |
Gen 1 ExaCC, OCC DBCS, and ODA will have 3 additional months of
support life. The end of life dates for databases on these platforms is:
|
Jan 28,
2020 |
Restructured
original document, removed older releases that are no longer covered under
Premier or Extended Support, removed unnecessary information contained in
other documents, Added estimated release dates for annual release 20c. |
No comments:
Post a Comment